Customized Electric Power Distribution Unit Low Voltage Switch Gear MNS BOX
MNS is the introduction of foreign technology by our company and the adoption of ABB's global standards to adapt to the needs of the development of the power industry Into the high performance low voltage switchgear. Now it has won the title of "Shandong Famous Brand". The effective installation space of MNS is 72E, which can provide a better choice for the size and capacity configuration of the pull-out functional unit 8E/4,8E /2,8E,16E,24E; A maximum of 36 loops can be installed in a single cabinet. Various designs (withdrawable, fixed, plug-in, etc.) can be mixed and installed in a single system for optimal combination. Can adapt to different working environment. And achieve the corresponding protection level.
Specifications |
Item |
Parameters |
Features |
The design is compact and can accommodate more functional units in a smaller space. |
Structure |
Strong versatility and flexible assembly,The 25mm C-shaped profile can meet the requirements of various structural types, protection levels and use environment. |
Standard module design |
consists of protection, operation, conversion, control, regulation, measurement, indication and other standard units |
Compensation method |
Combination of three-phase compensation and single-phase compensation. |
Safety |
A large number of high-strength flame-retardant engineering plastic components are used to effectively enhance protection safety. |
FAQ
1. Q: Are you a manufacturer?
A: Yes, we are a manufacturer. Our factory is in Weifang, Shandong.
2. Q: How long is the shelf life?
A: Every product has 1 year quality guarantee.
3. Do you have certification?
Answer: Yes. Our products all have CCC certificate. All electrical parts have CE certificates, if you need any other certificates, we can help you get them.
4. Q: How to buy?
A: Please contact me by email or online, let me know your situation, I will give you a professional solution.
5. Q: Payment method?
A: T/T, L/C.
6. Q: How is the production situation?
A: The production time is 4~6 weeks.
7. Q: After sales service?
A:All goods are tested before leaving the factory, and the maintenance is very easy. Video guide.